Pipeline Reroute Project
I3 Services
Routing
Preliminary Survey
Mapping
Location
Northern West Virginia
This project consisted of a 1,500’ replacement and reroute of a 14” bare steel pipeline with 12” FBE coated steel pipe into an area with greater soil stability. Our team completed the routing of the new line as well as the preliminary survey and mapping for the project. This image shows a portion of the alignment sheet with the area being avoided.